Features
About this care
What will you pay per month?
Choose your days and enter your income. You will see right away what you pay here per month, after childcare benefit.
GGD Inspection
Violations
Inspection date: October 6, 2026
Strengths
- Staff-child ratio is now correctly implemented according to the calculation rules
- Deployment of staff in training meets the conditions, including a supervision plan with written consent
- Pedagogical policy plan now contains a concrete description of responsible daycare
- Procedure for merging groups has been further elaborated
- Safe sleeping and indoor climate: registration lists present, CO₂ values below 950 ppm
- Hygienic working is carried out in accordance with policy
- Measures against transgressive behaviour are sufficiently concretely described
Shortcomings
- Pedagogical policy plan must describe more concretely how staffing is aligned with the number and age of children when merging groups
- Action plan for indoor climate must be more concrete: establish CO₂ limit values, temperature limits, ventilation standards and frequency of checks
- Action plan for food safety must describe concrete actions when refrigerator temperature is exceeded
- Implementation of revised safety and health policy must be better safeguarded and demonstrated for all staff
Violations
- Pedagogical policy plan contains no concrete description of how the staff-child ratio is met through staffing deployment, including when merging groups
- Action plan for indoor climate is insufficiently concrete: no limit values for CO₂ and temperature, no frequency of checks, no definition of adequate ventilation
- Action plan for food safety is insufficiently concrete: no concrete actions described for refrigerator temperature above 7°C
- Practice not in accordance with safety and health policy: refrigerator temperature 9-12°C (standard: max 7°C), breast milk stored unsafely in refrigerator door above 4°C, no measures taken after warning
- Revised safety and health policy not demonstrably implemented by all staff within recovery period; no written confirmation of policy read, no team meeting before expiry of recovery period
- Refrigerator temperature registrations are incorrect: all checks recorded as approved while temperature is structurally too high
Summary
GGD Hart voor Brabant conducted a follow-up investigation on 6 October 2026 at daycare center (kinderdagverblijf/KDV) HaGu 't Leeuwtje in Veghel. This investigation followed an annual inspection on 15 June 2026 in which violations had been identified. The municipality of Meierijstad had issued a written directive with a recovery period. Some of the violations have been resolved, but not all. The staff-child ratio and deployment of staff in training now comply. However, the pedagogical policy plan still lacks a concrete description of staffing deployment when merging groups. The safety and health policy has been revised, but the action plans for indoor climate and food safety are insufficiently concrete. In practice, operations are not in accordance with policy: the refrigerator temperature was 9-12°C (standard: max 7°C), breast milk was stored unsafely, and the revised policy was not demonstrably implemented by all staff. On 13 October 2026 as well, the refrigerator was still too warm. Due to recidivism, no recovery offer was made.
Reviews
Flexibel en prettig KDV. Goed contact met de medewerkers.
Kinderdagverblijf 't Leeuwtje heeft alle opvangvormen in huis. Opvang overdag, na school of incidentele opvang. U kiest wat het best past bij uw situa...
Questions & answers
Have a question about Kinderdagverblijf HaGu? Ask your question and other parents or the childcare itself can answer.
There are no questions about this childcare yet. Be the first!